Solar test 12 failed after two days. I guess the Raspberry Pi 3B takes up…
Category: Rover
The Great Mojave Rover

2018-08-26 Update
I am done printing out the Tub today. I needed to re-work the mast connection…

Printing has begun and a Heat test.
Caution: Random Thoughts I started printing the Tub and differential for Rover 3.0. This time…

Rover 3.0 Design Begins
Now that the Raspberry Pi Zero W is continually running for a few weeks, It’s time…

PLA Melt Test Result
I know that PLA will not make it through the summer heat, but let’s test…

Solar Test 11
This hopefully will the be last solar test. Based on the previous 10 tests I…

Solar Test #9 Called
Solar Test #9 was called due to rain. Solar Test #10 did not work. Solar…

Solar Test #9 Update
Solar test #9 is still going strong. For reference, the solar test started Sunday, 2018-06-23…

Solar Test #9
Started a new solar test yesterday. The last 8 did not work out as planned….

Solar Test #8
Well, #7 did not work. I think I was getting some voltage leakage to the…